Bring recent electricity bills so the design team can understand seasonal use. Note when major appliances operate.

Share future plans, such as an electric vehicle or additional appliances, so the design can consider changing needs.

A site survey checks the roof, shade and electrical system before a final design and quotation are prepared.

Information for a clearer assessment

List the appliances used during the day and at night, and when people are usually at home. Bring several electricity bills if available so the team can see changes in demand.

Separate available information from survey findings

Start with information you can collect without approaching electrical equipment: several electricity bills, the building type, occupancy hours and regularly used appliances. Photograph the proposed area from a safe position. You do not need to access the roof to provide every angle.

Rooftop solar panels beside a planted area

Questions before deciding

Ask the team to explain generation assumptions, system size, equipment, work scope and warranty terms. A site assessment helps avoid choosing capacity on roof area alone.

Related information: Residential solar · Understanding solar savings

What an electricity bill can and cannot tell you

A monthly bill shows overall consumption, but not how much of it coincides with solar generation. Note when air conditioning, pumps and other major loads operate. Keep future EV charging or building expansion separate from equipment already in use so assumptions remain clear.

What to expect from the first discussion

The team should identify missing information, items that require a site visit and the next steps before final system sizing. Preparation makes the conversation more useful, but does not replace assessment of the roof, shading and electrical installation. Keep your questions to compare with the eventual proposal.